您的位置:首页 > 博客

打通绕城与仙林间断头路 徐庄互通年底前将验收通车

时间:2019-07-15
ag真人游戏平台

With the establishment of a new positioning for the Zidong area in the urban development plan of Nanjing, the measures to break through the road and realize the development of traffic are also accelerating. The reporter learned from the Nanjing Highway Management Office yesterday that the Xuzhuang Interchange Project, which has been in operation for more than a month, is going smoothly. It is expected that the bridge superstructure and pavement structure will be constructed in the middle and late this month. As one of the key projects for the demolition road management of the transportation department this year, it is expected that the main structure will be completed before the National Day this year. At the end of the year, the direct communication between the city and the Xianlin area will be realized, greatly relaxing the horse group and the east. Yangfang exchanges the pressure of travel.

Inter-regional broken road. The construction of Xuzhuang Interchange is to break through the broken road between the city and Xianlin. The project starts from the Xuzhou Interchange of the Ring Road in the south, and connects with the existing urban main road Ziqi Road in the form of intercommunication. The end point is located at the intersection of the current Ring Road and Xuanwu Avenue, and the main line around the city is 1.66 kilometers. It adopts the A-shaped single-horn intercommunication and the cross-winding road form on the branch line. The ramp adopts the over-the-line bridge form to cross the main line. The design speed of the intercommunication main line is 100km/h, and the design speed of the intercommunication ramp is 40km/h. After the project is completed and opened to traffic, the office workers and surrounding residents who drive over can drive directly from the city to Xianlin, without having to bypass the horses or the Dongyangfang.The passage can also alleviate the pressure on the Xianlin Avenue around the city. It is expected to share 20,000 traffic per day.The Broken Road, which does not cross the city road, connects it to the ring road, directly alleviating the pressure on the surrounding office workers and nearby residents to enter and exit the software park.xx
日期归档
  • 友情链接:
  • ag真人平台 版权所有© www.formuladareconquistabr.com 技术支持:ag真人平台| 网站地图